1991 – 1994 Electrical refurbishment MOD Main Building Whitehall.  Contract Value:  £4 million including installation of generators and UPS systems along with the complete electrical installation for the new CHoTs system.

 

1994 - 2007 MOD contracts throughout Germany comprising complete install from the main header to the small power outlets.  Installation of main computer rooms, Also install fibre optic WANs and LANs throughout all MOD sites along with schools and hospitals

 

2005 - 2011  Briggs & Forrester HQ.   To install from main LV transformer to switch rooms and associated landlords supplies.  To carry out the complete install of all electrical installations for the office block.

 

2006 – 2009   CBX Phase  III.   To carry out landlord’s installs from all  Xergi supply panels. And 460 apartments Contract Value:  £700K.  2008 - Purbeck road Cambridge to carry out landlord’s installs from the new Substation to all 152 apartments Contract value £200K.  Clean all apartments down prior to hand over.

 

2007 – 2008   RNAS Culdrose.  Carry out civil works to install a four-way duct installation to link 102 buildings and the installation of six main Node computer rooms.  11.5km of civil work comprising of 6 way and 2 way ducting and approximately 450 man-holes to provide for an HT ring-main throughout camp.  Also to carry out a fibre-optic WAN for the site.  Contract Value:  £1.9 million

 

2007 – 2008   Heathrow Terminal 5 Carry out Data installation in office compounds and carry out the install of cross-site fibre optic cabling for the LAN infrastructure.  Contract value;   £ 128,400.00

 

2008- Bandford Dorset   Carry out civils works to install a four-way duct installation to link 42 buildings.  5.5km of work.  Install WAN for DiiF throughout the camp.  Also to carry out a fibre-optic WAN for the site and the build of the main computer room.  Contract Value:  £450,000.00

 

2008 2009 RNAS Yeovilton   Carry out civil works to install a four-way duct installation to link 76 buildings.  8.5km of work comprising of approximately 108 man-holes to provide for aDiiF installation throughout the airfield.  Also to carry out a fibre-optic WAN for the site along with the main computer room and four  Nodes.  Contract Value:  £538,000.00

 

2008-2010 Galliard Homes to carry out all electrical installations for the site Inc Substation LV room Landlords install and 152 Apartments Contract value £380K.  Clean all apartments prior to hand over.

 

2009 Installation of 33KVA and 11KVA transformers, supply cables and control wiring for Xergi EDF at a CHP unit in Milton Keynes

Value 9,800.00

 

2009 Installation of 33KVA and 11KVA transformers, 11KV cables and control wiring for Xergi EDF at a CHP unit in Woking

Value 12,580.00

 

2009-2010 – RNAS Yeovilton Install 398m of two-way duct for DIIf link up all areas OSP works.  Install fibre optic WAN backbone to 23 buildings.  Install local fibre optic and copper networks into each building to the end-user.  Value £ 231,000.00

 

2010-2012 – Carry out the installation of Landlord supplies and all apartments for Ontario Tower Canary Warf.  Include 212 bedroom Hotel, Car Park and 112 Apartments.  Test and commission.

 

2011-2011 Carry out the BEMS system for Mechanical Plant at Henlease Skills College, Bristol. Work value £97,500.00

 

2011 – 2011  To provide the Electrical installation and Data cabling for the install at St Peter's School Euston London  Work included the Sure start school, accommodation block and Classroom installation.  Value £63,000.00

 

2010-2012 –  Carry out the installation of Data installations for the Atlas consortium for Increment  3 and CASD works on multiple MOD sites value from £500.00 to £134,000.00 Works included the installation of Computer suites, Civil works, Copper Data installations, Fibre Wan installs and Electrical installations.

 

2012 Carry out the installation of Electrical and Data installations for the new build Armoury at RAF Odiham value £27,500.00

 

2012 Installation of several Solar PV arrays varying in size from 4 KW to 27KW installs

 

2012 Carry out the installation of Electrical and Data installations for the new build Gymnasium and rehab centre at RAF Odiham value £39,500.00

 

2012 - 2013 Carry out OSP works at RAF Kinloss & Coningsby for existing manhole system. Value £112,000.00

 

2013-2014 -  RAF Odiham Install 7940m of two-way duct for DIIf link up all areas OSP works and to link up a runway lighting system.  Install fibre optic WAN backbone to 42 buildings.  Install local fibre optic and copper networks into each building to the end-user. 

 

2013 - 2015 RAF Odiham Electrical  Installation of new 400Herts system for Helicopter repairs, inc Main panel Board, Frequency inverters, Sub boards etc Value £65,500.00;  Carry out the Electrical refurbishment of junior ranks residence three blocks of 48 bedrooms inc rest rooms kitchens etc Value £72,500.00

 

 

2013-2015 - Carry out the installation of Data & Electrical installations for Fujitsu on the MOD CIS frame work agreement.  The works have taken place on multiple MOD sites value from £500.00 to £74,000.00 Works included the installation of Computer suites, Civil works, Copper Data installations, Fibre Wan installs and Electrical installations.

 

2013 – 2015 – Carry out Data install at STS Rainbrook for the MOJ Data install of Cat 6 cabling.

 

2015-2017 - Carry out Data installations and small electrical installations and maintenance at University of East Anglia IT section Value £142,000

 

2016-2018 – Carry out works for NG Bailey for the following projects the structured cabling install at the University of Bristol Life sciences on behalf of NG Bailey Cat 6A SUTP cable Value £68,000

Carry out the installation of structured cabling system for HMP Winston green prison Birmingham Cat5e STP cabling installed Value £46,000

 Carry our Structured cabling install at GCHQ Churchill using Cat 6A STP. Value £62,000

Carry out the installation of infrastructure and structured cabling for the police HQ at Hindlip Worcester using Cat6A STP cabling. Value £44,000

 

2016 -2018 – Carry out the two, four six and eight-way civil install for Aspire and Aspire capital works at various sites including Warminster, Bulford, Larkhill and Perham Down Value to date £675,000

 

2017 – 2018 – Northern Ireland carry out the upgrade for the two HQ buildings for MOD on several bases providing all materials for the infrastructure and cabling of a Cat 6 cable system for Wifinity. Value £128,000

 

2018-2021 - Carry out the installation of Data & Electrical installations for NG Bailey on the MOD CIS framework agreement in the UK and Germany.  The works have taken place on multiple MOD sites value from £500.00 to £97,000.00 Works included the installation of Computer suites, Civil works, Copper Data installations, Fibre Wan installs and Electrical installations.

 

2018-2019

Carry out the Civil installation to link up the majority of Buildings with an 8-way duct system underground to a depth of 1100mm then install Blown fibre to all buildings for Data Techniques at RAF Croughton on behalf of BT Federal value £600,000.00

 

2019-2021

Carry out the Civil installation to link up the majority of Buildings with a four-way duct system underground to a depth of 900mm, then install back bone fibre optic systems and blown fibre to remote areas. for Data Techniques at RAF Fairford on behalf of BT Federal value £1,300,000.00.